
Slurm Remains Top Resource Manager
$2,000.00
Authors: Melissa Riddle and Mark Nossokoff
Publication Date: June 2February3 20
Length: 3 pages
Slurm continues to be the most popular job queuing, resource manager, or scheduling software at HPC sites around the world. In a recent study, Slurm maintained its lead with half of all respondents (50.0%) reporting they use Slurm at least some of the time. After Slurm, the most popular resource managers and schedulers were OpenPBS (18.9%), PBS Pro (13.9%), Torque (13.3%), NQS (12.2%), and LSF (10.6%).
This data is from an annual study that is part of the eighth edition of Hyperion Research’s HPC end-user-based tracking of the HPC marketplace. It included 181 HPC end-user sites with 3,830 HPC systems.
Related Products
World’s First Data Center APU Stood Up in AMD Laboratory
Tom Sorensen and Alex Norton
During the recent Wells Fargo 2022 TMT Summit, Mark Papermaster, CTO of AMD, reported that the Instinct MI300 accelerated processing unit (APU) is, as of early December 2022, up and running. Currently confined to their in-house lab, the Instinct MI300 will be used in the exascale supercomputer currently in development at Lawrence Livermore National Laboratory, El Capitan, scheduled to be delivered in 2024. Described by Papermaster as a "true datacenter APU," AMD expects general availability of the processor in 2023. This multi-chiplet processor makes use of both AMD's Zen 4 (x86) CPU architecture and CDNA 3, AMD's GPU architecture, designed specifically with exascale computing in mind, and will be produced by Taiwan's TSCM at the 5nm process node. Papermaster sees this development as an important way to continue introducing greater density and optimization into components now that the sector is no longer in the era of the "old Moore's Law."
December 2022 | Uncategorized
NOAA and Microsoft Announce Cloud Computing Collaboration to Advance Climate-Ready Nation Mission
Jaclyn Ludema and Mark Nossokoff
The US National Oceanic and Atmospheric Administration (NOAA) and Microsoft have entered into a Cooperative Research and Development Agreement (CRADA), formalizing NOAA's commitment to using Microsoft Azure cloud computing resources in the pursuit of NOAA's mission to build a Climate[1]Ready Nation by 2030. Several initiatives are envisioned whereby NOAA scientists and engineers will work with Microsoft experts to leverage Azure's machine learning and HPC capabilities: ▪ Fast-tracking innovative contributions to NOAA Earth Prediction Innovation Center (EPIC) earth systems modeling and research ▪ Applying machine learning capabilities to improve models supporting air quality, smoke, and particulate pollution forecasts, as well as relevant NOAA climate models ▪ Accelerating NOAA Fisheries' survey and observations data collection and management ▪ Creating new ocean observations cataloging efforts ▪ Designing resilient and accessible weather modeling and forecasting that can incorporate external data sources with NOAA enterprise data
December 2022 | Uncategorized

