Department of Energy Announces Request for Proposal for Exascale Computing Platforms to be Delivered Starting in 2021
$2,500.00
Authors: Alex Larzelere, Bob Sorensen, Earl Joseph, Steve Conway and Alex Norton
Publication Date: April 2018
Length: 3 pages
This Quick Take looks at the recent announcement by the Department of Energy (DOE) of the release of a Request for Proposal (RFP) for exascale systems to be installed at Oak Ridge National Laboratory (ORNL) and Lawrence Livermore National Laboratory (LLNL) in the 2021-2022 time frame. The RFP also says that a third system (different from the ORNL computer) may be installed at Argonne National Laboratory (ANL) in 2022.
Related Products
AWS New Bare Metal Instance: Courting the HPC Crowd by Combining Bare Metal Performance with Virtualized Cloud Functionality
Bob Sorensen, Earl Joseph, Steve Conway, Alex Norton
This Quick Take looks at Amazon's recent announcement of a new EC2 Bare Metal offering that provides users with direct, non-virtualized access to a processor, memory, storage and related networking instance. Amazon uses custom hardware in an effort to wring out the highest possible performance from the basic hardware set up while still offering a full complement of cloud-based software support. This development is a positive one for HPC users looking to migrate workloads to public clouds as Amazon is addressing one of the most vexinghurdles of HPC in the cloud: the performance overhead of running applicationsin a virtualized, performance limiting environment.
January 2018 | Quick Take
ORNL Announces Newest Leadership HPC: It’s More Than Just Exaflops
Bob Sorensen
The Department of Energy at Oak Ridge National Laboratory (ORNL) recently announced plans for the development of a 1.5 exaflops system called Frontier to be delivered in 2021. US HPC maker Cray and chip maker AMD are the two key US commercial partners in this effort. Despite numerous press articles centered on the 1.5 exaflops peak performance of Frontier, ORNL's original RFP released in April of 2018 clearly called out the diverse workload requirements that Frontier would have to successfully handle that span the traditional modeling and simulation sector, big data analysis, and AI applications, while demonstrating a 50X improvement in solving key DOE science problems that today run at the 20 petaflops level. To meet those ambitious goals, strong support from DOE's companion $1.7 billion Exascale Computing Project (ECP) will be critical.
May 2019 | Quick Take